SURFACE & UNDERGROUND PROJECTS


FLINT RAIL PROJECTS originated as a specialist in the repair and construction of SURFACE and UNDERGROUND rail systems.

The Company’s ability to ensure safe and efficient rail systems for rail transportation is valued by Clients throughout Southern Africa. The permanent way is the cornerstone for all rail systems.

SAFE & EFFICIENT

%




SURFACE PROJECTS




UNDERGROUND PROJECTS




The construction and maintenance of new and existing rail tracks



Thermit welding of rail tracks, wheel spin burns, battered rail ends, crossings, etc



Supply of Perway Materials: sleepers, rails, turnouts, etc



Performing Safety Audits for clients



Crane rails: construction, maintenance and repairs



Rail Bonding



Gantries, stacker reclaimer and ship loader track work



Management of industrial rail systems



The construction, rehabilitation and maintenance of new and existing underground haulages



Thermit and arc butt welding of rail joints



Underground civil installations, including box fronts, tips and pipe work



Performing Safety Audits on existing haulages



Civil and Electrical works



Performing ‘Quality Assessment Report’ on haulages with  measuring trollies, and report on the condition of the tracks, without disrupting your production process



Manufacture and supply of Concrete Curbstone Slabs for use in underground railway construction

RAIL SAFETY REGULATOR MATTERS


OCCURRENCE MANAGEMENT
STATUTORY REQUIREMENTS

All statutory requirements of the Railway Safety Regulator

PERMIT APPLICATIONS

Full Permit applications from the Railway Safety Regulator

SAFETY PLANS

Annual Safety Improvement Plans (ASIP) for submission to the Railway Safety Regulator

QUARTERLY REPORTS

Quarterly Reports for the Railway Safety Regulator

INSPECTION

Inspection and compilation of asset condition reports

SAFETY MANAGEMENT

Rail Safety Audits and Safety Management Systems reporting

CALL US TODAY!

HERE




QUALITY & PROJECTS MANAGEMENT

  • The Institute of Civil Engineers document: A new Engineering Contract – Latest Edition.
  • TFR’s Engineering Instruction – GI.049 Issue 2 May 2001 – Earthing and Bonding arrangements in rail sidings handling flammable/explosive commodities.
  • TFR’s Provision and construction of Private Sidings – March 2001 Edition.
  • SABS – 1200
  • TRANSNET FREIGHT RAIL’S
  • General conditions of contract 1990[Works of Civil Engineering Construction – 6th Edition]
    • SANS 10339:2009 (Edition 2.1) – Underground Rail Track work in mines
    • General and Project specifications pertaining to specific projects
    • SANS – 3000 – Act. 16 of 2002

Quality Control Sheets are in place for all categories of track work.